South Park Parametrics
location: San Francisco, CA
date: 2016 - 2018
size: .9 acre
description: What follows are images from various experiments and applications of parametric modeling used in the design development of South Park.
email information@fletcherstudio.com to request materials
PLAY STRUCTURE
REBUILDING (SIMPLIFYING) CONTOUR LINES
PAVING SCRIPTS
The paving at South Park was fully dynamic with the length, width, sliders, and radii able to be changed as needed.
the david bowie bench
the COMMUNITY TABLE
percolation drainage system visualization
A drywell and french drainage system was used in the park to percolate rainwater rather than connect the park to the city sewer main. Grasshopper allowed us to visualize the drainage system and convince the public utilities commission that it would work.
use of weighted attactors
Grasshopper was used to replicate the original analog design process using weighted attractors.