South Park Parametrics

project: South Park

location: San Francisco, CA
date: 2016 - 2018
size: .9 acre


description: What follows are images from various experiments and applications of parametric modeling used in the design development of South Park.
email information@fletcherstudio.com to request materials

PLAY STRUCTURE

topo_process.PNG
5.PNG
 

REBUILDING (SIMPLIFYING) CONTOUR LINES

7.JPG
 

PAVING SCRIPTS

The paving at South Park was fully dynamic with the length, width, sliders, and radii able to be changed as needed.

8.PNG
 

the david bowie bench

B-Pers..jpg

the COMMUNITY TABLE

6.JPG
 

percolation drainage system visualization

A drywell and french drainage system was used in the park to percolate rainwater rather than connect the park to the city sewer main. Grasshopper allowed us to visualize the drainage system and convince the public utilities commission that it would work.

DRAINAGE IMAGEsm.jpg
 

use of weighted attactors

Grasshopper was used to replicate the original analog design process using weighted attractors.

_Compiled Vector Diagrams Page 003.jpg
 

material assignment

_Compiled Vector Diagrams Page 007.jpg